Description: Providing and laying missing sewer lines near school of India at K R Pete town under 15th finance Non Million Plus City grants of K R Pete for the year 2021 22
Details: Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required, utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. etc., complete with all lead and lifts and as directed by the Engineer in charge. etc., complete with all lead and lifts and as directed by the Engineer in charge. In all kind of soils 0 to 1.5 mtr depth. ---- As per SBD;do- In all kind of soils. 1.5 to 3.0 mtr depth. ---- As per SBD;do-ordinary/soft rock (without requiring blasting) 0 to 1.5 mtr depth. ---- As per SBD;do- ordinary/soft rock (without requiring blasting) 1.5 to 3.0 mt
Sector: Water supply and Sewerage