Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.;maintenance of earth shoulder (stripping excess soil) stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor;patching of shallow potholes using sdbc gr ii 25 mm thick patching of shallow potholes on asphalt surfaces by using semi dense bituminous concrete 25mm thickness. the cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per
Sector: PWD