Details: earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work in ordinary/soft rock without blasting upto 1.5 m depth [pg no. 8, item no. 1.15.1 pwd sr 2023-24 vol-1 ] ;providing and laying in position cement concrete for levelling course for all works in foundation. the granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant is codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, usage charges of machinery,
Sector: RDPR