Details: cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications for: complete as per specification and direction of engineer in charge .;earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. in all kinds of soils depth upto 3 m complete as per specification and direction of engineer in charge .;earth work excavation for foundation by mechanical means for allworks & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, struttin
Sector: Water supply and Sewerage