Details: searching and preparation of lift irrigation proposal with all required documents (lump sum);earth work excavation for pipelines/cables by manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. (pwd common sr 2023-24, vol-1, p no.6, i.no.1.6.1)in all kinds of soils. depth upto 1.50m;providing and installing at site of work p.v.c. pipes including cost of pipes and specials and labou
Sector: Others