Details: scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by mechanical means using hydraulic excavator with in all lifts and lead --with all lead, lift, loading, unloading, labour, fuel, hire charges of machineries, equipments including all incidental charges as per detailed specifications etc., complete and as per directions of the engineer in charge of the work.;clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. --with all lead, lift, loading, unloading, labour, fuel, hire charges of machineries, equipments including all incidental charges as per detailed specifications etc., complete and as per directions of the engineer in charge of th
Sector: RDPR