Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. bby manual means in area of light jungle with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental charges etc., complete and as per specification and directions of the engineer incharge of the work;earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & sta
Sector: RDPR