Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. morth specification no:201 (i). by mechanical means a. in area of light jungle. ;construction of embankment by excavating the available approved gravel/murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. if the height of embankment construction is more than 1.50 m add 5% per m for every 1.50 m height or part there off. deduct 5% per m if rollers ar
Sector: PWD