Description: AME of Canal for the year 2024 25 of NRBC Main Canal Km 125 00 to 145 00 of NRBC
Details: Engaing unskilled labourer, unskilled (Heavy work) unskilled (Light work) for remoal of obstructions & hurdles caused to flow of water in canal system and as directed by Engineer-in-charge.;Engaing Hydraulic excavator 0.90 Bucket capacity (for water management work / removing hurdles during on off period for smooth flow of water in canal & scarifying the Service Road for smootn movement of vehicles) and as directed by Engineer-in-charge.;Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work and as directed by Engineer-in-charge.;
Sector: Irrigation