Details: removing and resetting of footpath slab (approved arrival rate).;removing and resetting of kerb stone (approved arrival rate).;earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work, in all kinds of soils depth upto 1.5 m (item no. 1.4.1, page no. 05, vol - i, kpwd sr 2023-24).;providing and laying in position cement concrete for levelling course for all works in foundation. the granite/trap/basalt crushed graded coarse aggregates and f
Sector: Urban Authority