Details: clearing and grubbing road land including uprooting rank vegitation, grass, bush, shrubs, saplings and trees of girth upto 300 mm, removal stumps of trees cut earlier and disposal of unserviceble materials and stacking of serviceble material to be used or auctioned. including removal and disposal of top organize soil not exceeding 150 mm in thickness , by mechanical means using dozer. inthorny jungle area pwd sr 2023-24 vol-iii pg no-9 item no.2.5 (ii) (b);earthwork excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such similar works in all kinds of soils, as per drawing and technical specifications, including setting out. sharing strutting, barrieading, caution lights, removal of stumps and other deletrious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting and stacking the selected stuff for reuse in radius of 50 m and lift upt 1.5 m including cost of labour
Sector: Forest and Environment