Details: clearing grass and remobal of - clearning grass and removal of up to a distance of 50 meters outside the periphery of the area. including cost of all materials, labour, hire charges of of all machinery, barricading, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as directed by the the engineer-in-charge for successful completion of work-by manual means- providing and applying tack coat with vg-10 grade bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom, & dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as directed by the the engineer-in-charge for successful completion of work. providing and laying dense graded bitu
Sector: Road development