Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.by mechanicle means using dozer. a) in area of light jungle complete as per direction of engineer incharge (unit read as 100m2);compacting original ground supporting embankment: loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at omc andthen compacted by rolling so as to achieve minimum dry densityas given in table 300-2 for embankment construction.complete as per direction of engineer incharge;construction of embankment by excavating the available approved gravel/murrum deposited at a place or borrow pits durin
Sector: Irrigation