Details: road clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shurbs, sapling and trees girth up to 300mm,removal of sumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned,including lead and including removal and disposal of top organic soil not exceeding 150mm in thickness all labour, hire charges of all machineries., complete. (ii) by mechanical means (a) in area of light jungle.as per direction of engineer in charge. scarifying the existing bituminous surface to a depth of 50mm and disposal of scarified material within all lifts and with lead including all labour, load, unload, usage charges of all machinary etc complete. (i) by mechinery means using hydralic excavator as per direction of engineer in charge. construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layer
Sector: Road development