Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete.in area of light jungle-by mechanical means using dozer and as directed by engineer in charge of the work. tack coat on bituminous surfaces providing and applying tack coat with bitumen emulsion (rs1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom & dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery,lead,lift, loading & unloading etc., complete, including lead for emulsion and as directed by eng
Sector: Road development