Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (item no 2.5 (ii)(b)in area of thorny jungle p.no. 9 vol 3 common sr for the year 2023-24). .complete with all leads and lifts. as direced by engineer in charge.;excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete.( as per vol 4 wrdo sr for 2023-24 p.no.104 i.no wrd 8.24) .complete with all leads and lifts. as direced by engineer in charge.;
Sector: Irrigation