Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. complete as per direction of engineer incharge.;excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete as per direction of engineer incharge.;scarifying existing granular surface to a depth of 50 mm by mechanical means using hydraulic excavator complete as per direction of engineer incharge.;
Sector: Irrigation