Details: survey and demarcation of plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with thick under growth;aligning in the planting area and marking for pit (without staking) (aligning of pit in stagerred design);excavation of pits of size 0.60mtr. x 0.60mtr. x 0.60 mtr. with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in hard soil. (400 pits x 0.60 m3 1 pit = 0.216 );barbed wire fencing with wooden fence posts;cost of raising 8" x 12" pb seedling, including 10% casuality replacement;miscellaneous, unforeseen & rounding off;
Sector: Forest and Environment