Description: The work includes advance operations for the raising of 25 hectares of plantation ANR Model 02 including seedling raising The project will be executed at Sy No 342 of Gowthamapura within the Chordi Range during the year 2024 25
Details: Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with thick under growth;Aligning in the planting area and marking for pit (without staking) (Aligning of pit in Stagerred design);Excavation of pits of size 0.60Mtr. x 0.60Mtr. x 0.60 Mtr. with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in Hard Soil. (400 pits x 0.60 M3 1 pit = 0.216 );BARBED WIRE FENCING WITH WOODEN FENCE POSTS;Cost of Raising 8" x 12" PB seedling, including 10% Casuality Replacement;Miscellaneous, Unforeseen & rounding off;
Sector: Forest and Environment