Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used. including removal and disposal of top organic soil not exceeding 150 mm in thickness.including cost of all lifts and lead, loading and unloading chargres , trnsporting, cost of material & labour charges, hire charges of all machineries, materials with all other incidental charges etc., complete as per specification and as per the direction of the engineer-in-charge for successful completion of work. by mechanical means in light jungle. scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material including cost of all lifts and lead, loading and unloading chargres , cost of material & labour charges, transporting, hire charges of all machineries, materials with all other incidental c
Sector: Road development