Description: Temporary Restoration of roads falling under the jursdiction of PMGSY Division Billawar on emergency basis by way of clearance of Slips Snow likely to occurs during the financial year 2024 25 Sub Division Bani Group B Name of Work Temporary Restoration of roads falling under the jursdiction of PMGSY Division Billawar on emergency basis by way of clearance of Slips Snow likely to occurs during the financial year 2024 25 Sub Division Bani Group B 1 Barmota to Guttu Pkg No JK07 92 Length 15 326 Kms 2 Barmota to Doulka Pkg No JK07 93 Length 10 459 Kms 3 T01 to Hathen Pkg No Jk07 90 Length 12 800 Kms
Details: Clearing snow (with frost) from roads by manual means using picks and shovels, snow depth up to 150mm Clearing snow (with out frost) from Roads by Manually/ mechanical Snow depth upto 150 mm Snow depth over 150 mm but up to 250 mm Snow depth over 250 mm but up to 350 mm Snow depth over 350 mm but up to 450 mm Snow depth over 450 mm but up to 550 mm Snow depth over 550 mm but up to 650 mm Snow depth over 650 mm but up to 750 mm Snow depth over 750 mm but up to 850 mm Snow depth over 850 mm but up to 950 mm Snow depth over 950 mm but up to 1050 mm Slip Clearance Slip Clearance in ordinary soil with all leads and lifts etc complete job, as per the directions of the Engineer In-charge at site without damaging the public/ Pvt. Property. Slip clearance in soils mixed with moorum kankar/shingle/Boulders including safe disposal with all leads and lifts complete job as per the directions of the Engineer In-charge at site without damaging the public / Pvt. Property. Slip Clearance in
Sector: Road development