Description: Temporary Restoration of roads falling under the jursdiction of PMGSY Division Billawar on emergency basis by way of clearance of Slips likely to occurs during the financial year 2024 25 Sub Division Billawar Group F Name of Work Temporary Restoration of roads falling under the jursdiction of PMGSY Division Billawar on emergency basis by way of clearance of Slips likely to occurs during the financial year 2024 25 Sub Division Billawar Group F 1 Kohag to Bhatodi Part I Pkg No JK07 75 Length 20 00 Kms 2 Kohag to Bhatodi Part II Pkg No JK07 218 Length 14 600 Kms 3 Kohag to Lahri Pkg No JK07 239 Length 5 900 Kms 4 Kudetar to Baggan Pkg No JK07 237 Length 4 00 Kms 5 Mandli to Swali Pkg No JK07 185 Length 2 450 Kms 6 Kishanpur to Moh Nagrotian Pkg No JK07 230 Length 2 00 Kms 7 Kishanpur to Nargari Pkg No JK07 234 Length 4 000 Kms
Details: Slip Clearance Slip Clearance in ordinary soil with all leads and lifts etc complete job, as per the directions of the Engineer In-charge at site without damaging the public/ Pvt. Property. Slip clearance in soils mixed with moorum kankar/shingle/Boulders including safe disposal with all leads and lifts complete job as per the directions of the Engineer In-charge at site without damaging the public / Pvt. Property. Slip Clearance in soils mixed with decomposed soils, by blasting or any other means incl. safe disposal. With all leads and lifts complete job as per the directions of the Engineer In-charge at site without damaging the public/ Pvt. Property. Excavation for Structure Earthwork in excavation for structures as per drawing and technical specification clauses 305.1 including setting out, construction of shoring and bracing removal of stumps and other deleterious material and disposal upto and lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated
Sector: Road development