Details: degutting of ac duct of raws ac compartmentscope of work1. of 20 mtr staging for cutting and removal of ac duct of raws tower.2. degutting of insulated duct of raws tower, area (1.5x 01) m²for 20 mtr of length.3. removal of fibre glass insulation, area (1.5x 01 m2 for 20 mtrof length.4. cutting of ms sheet (1.5x 01) m² for 20 mtr of length5. removal of 10 in no. vent opening with pipes, approx length 10mtr6. cutting of 20 in no ms angles of length 0.5 mtr each and 10 inno ms angles of length 3 mtr each
Sector: Police and Defense