Description: Inspection and repair of FAT and Oleum Tower in DCDA Acid Plant during ATA 2024 Name of Work Inspection and repair of FAT and Oleum Tower in DCDA Acid Plant during ATA 2024
Details: Inspection and repair of FAT and Oleum Tower in DCDA Acid Plant during ATA 2024 Opening and closing back the manhole dummies of FAT and Oleum Tower in DCDA Acid Plant. Temporary closing and opening shall be done if required before the final boxing up. Unit rate quoted shall be the total cost for both opening and closing back. FAT and Oleum Tower leaky pipes flanged gasket renewal as well as pipeline repair/welding works. Replacing/repairing the defective / leaky acid distribution header pipes, branch pipes, bend pipes etc of FAT and Oleum Tower in DCDA Acid Plant. Taking out the damaged spray nozzles of FAT and Oleum Tower in DCDA acid plant, wash well to clear the chocking, replace the damaged spray nozzles, and fix back or replace the nozzles with new one taken from stores. Opening the top manhole and taking out the candle filter of FAT and re-fixing / renewing after washing and repairing. The contractor shall do any repair on the mounting frame. FAT and Oleum Tower Channel repair
Sector: Industries and Factories