Description: GENERAL 2024 2029 Performance based maintenance between km 89 10 to km 103 20 of NH 183 A Name of Work GENERAL 2024 2029 Performance based maintenance between km 89 10 to km 103 20 of NH 183 A General Civil Work Under PBMC Mode
Details: 5.2.aProviding and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. OD182248/2023-2024 Dense Graded Bituminous Macadam : - For grading - II (26.5 mm nominal size) Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder (VG 30) @ 4.0 to weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. 10.5.1b Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, pai
Sector: Road development