Description: Work for shifting Electrical Utilities from Padikkal vayal to 26 th mile as part of KIIFB work under Electrical Section Unnikulam Kozhikode Name of Work Work for shifting Electrical Utilities from Padikkal vayal to 26th mile as part of KIIFB work under Electrical Section Unnikulam Kozhikode
Details: Dismantling one Transformer (upto and incl. 160kVA) from existing structure to ground. Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). Providing Transformer fencing, using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same. Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking. Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stackin
Sector: Power Sector