Description: SGHEP Maintenance of road at Moozhiyar colony and power house under Civil Sub division Moozhiyar Name of Work SGHEP Maintainence of road at moozhiyar colony and power house under Civil Sub Division Moozhiyar
Details: Modified Penetration Macadam 75 mm thick using Bitumen S-65Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.(B) 75 mm thick :- (II) Bitumen (S-65) Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing
Sector: Power Sector