Description: Spraying of water on coal transportation road from field time office to siding No 09 and from weighbridge no 12 to Railway Siding no 10 Balance period after completion of on going contract under Balram OCP Hingula Area Name of the Work Contract No
Details: Spraying of water on Coal Transportation Road for suppression of dust by mobile tanker having spraying arrangement, loading of water into tankers by pump or any other means by contractor's own arrangement, motor water coupling set & up and down sunction pump under pressure (the water spraying jets to be fitted at about 1.20 meter above the road surface and spraying nozzles are directed in a horizontal manner )the water spraying arrangement should be pressurized through hydraulic pressure of the tipper and loading of water into tankers by departmental arrangements with all lead and lift including the hire charges of water tanker, pump, cost of diesel, mobile, repair and maintenance and wages of driver and helper etc. all complete. Owning and operation cost for installation of vehicle tracking machine in Trucks/ Tanker/Tractor for route length tracking including rest hour for movement analysis and positioning with submission of report etc. complete as per instruction of EIC Total impact
Sector: Mining