Details: item description/ heading cutting, cleaning and removing the grass and other waste materials at play ground including disposal of same with all lead and lift as per the direction of eic. supply of labour for sports works as per direction of eic. (scope of work: the agency has to engage 10 nos unskilled labour per shift for 14 shifts (2 shifts per day for 7 days)) supply of water tanker having spraying with tap arrangement, loading of water into tankers by pump by contractor own arrangement with all lead and lift including hire charges of water tanker etc. all complete. supply of roller of minimum 8 to 10 tonnes for ground preparation as per instruction of eic. supply of lime powder (white) for track marking as per instruction of eic. supply of earthen glass (300ml) with different colours and plastic flags for track decoration as per instruction of eic. supply of plastic bucket (20liter) with jug for sport as per instruction of eic. supply of nylon rope 4mm dia for track lining as pe
Sector: Mining