Description: Repair and maintenance works of telecom infra on Holy Cave route through Pahalgam Axis for the year 2024 Name of Work Repair and maintenance works of telecom infra on Holy Cave route through Pahalgam Axis for the year 2024
Details: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size) 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated
Sector: Telecommunication