Description: Installation of New Distribution Transformer and related Electrical work on Semi Turnkey basis in Business Plan Year 2024BY25 Under Electricity Distribution Division I II III District Mainpuri Name of Work Installation of New Distribution Transformer and related Electrical work on Semi Turnkey basis in Business Plan Year 2024 25 Under Electricity Distribution Division I II III District Mainpuri
Details: Safe carriage of ST/PCC Pole 11/8.5 Mtr. Long from ESC, Mainpuri to Pit site of work including loading and unloading at both ends. Distance Approx. Erection of 11/8.5 Mtr. Long ST/PCC Poles by excavation of earth 1.5 mtr. deep and backfilling properly. Grouting of ST/PCC Pole with Cement, Sand and Stone Ballast in ratio 1:4:8 including cost of material i.e. Cement, Sand and Stone Ballast as per actual site requirement. Construction of Double Pole on PCC/STP with all respective material like Fuse set/TPMO/Earth Rod/Dropper Channel and Base Angel etc. Providing and fixing of Clamp nut and bolts. (As per RESPO Schedule) etc. Safe carriage of small line material from ESC, Mainpuri to Pit site of work including loading and unloading at both ends . Distance Approx 0 TO 30 KM. New Distribution Transformers 16 KVA to 100 KVA load at various 33/11 KV Substation Under Electricity Distribution Division - I, II, III, Mainpuri. Safe Carriage and Mounting with all respective material (As per Respo
Sector: Distribution