Description: REPAIR MAINT AND IMPROVEMENT OF LT PANEL INCL LT SWITCH GEAR EARTHING TIMER PANEL LT POLES POLE BOX OUTDOOR STREET LIGHTS LT DISTR NETWORK AT 407 FD HOSP RA BAZAR FAFA MD ACCN DD FAFA MD ACCN FAFA JCO ACCN AMC CHQ RECORDS ADJOINING AREA NAME OF WORK REPAIR MAINTENANCE AND IMPROVEMENT OF LT PANEL INCLUDING LT SWITCH GEAR EARTHING TIMER PANEL LT POLES POLE BOX OUTDOOR STREET LIGHTS LT DISTRIBUTION NETWORK AT 407 FD HOSP RA BAZAR FAFA MD ACCN DD FAFA MD ACCN FAFA JCO ACCN AMC CHQ RECORDS ADJOINING AREA OF AGE E M EXT ELECT UNDER GE E M LUCKNOW
Details: Excavation in trenches not exc. 1.5 m wide and not exc 1.5 mtr deep in soft / loose soil for laying / taking up / taking down of cables and getting out and levelling of bottom suface to required level all as specified and directed by Engineer- in- Charge. Returning filling in including spreading, levelling, watering and well ramming soil in layers not exceeding 25 cm thick all as specified and directed. Removing excavated soil n.exc 50 m and depositing where directed at a level n.exc 1.5 m above from the starting point complete all as specified and as directed. M&L for providing dry river sand as in sand cushioning below and above cable thickness as specified in SSR to under ground cable including punning down of sand in layer all as specified and directed by Engr-in-Charge.Note: for measurement purpose punned thickness of sand will be consider. M&L laying well burnt old size bricks, sub class "B" bricks, straight or curved on plan , laid flat with width equal to length of bri
Sector: Defense