Description: Dismantling Shifting and Installation two Nos of 2 x 1 5 TR High Sensible Split A c units from Second Floor Switch room in Main T E Bldg Aligarh to Main T E Bldg Hathras Name of Work Dismantling Shifting Installation two Nos of 2 x 1 5 TR High Sensible Split A c units from Second Floor Switch room in Main T E Bldg Aligarh to Main T E Bldg Hathras
Details: Dismantling and Shifting of existing 2 x 1.5 TR High Sensible Split A/c units with all accessories of Indoor and outdoor units, stands, copper pipes cables i/c loading & unloading by heavy labour and chain pulley block for outdoor condenser units at building projection of Second Floor and indoor units for switch room, Second Floor at T.E. Bldg. Aligarh to Ground Floor at T.E Bldg. Aligarh etc. complete as reqd. (with taking all safety majors) Transportation charges of 2 Nos. (2 x 1.5 TR) High Sensible A/c units aong with outdoor units, stands, cables, copper pipes, enclosure complte as required i/c loading & unloading by heavy labour and chain pulley block from Ground Floor in Main T.E. Bldg. Aligarh to Main T.E. Bldg. Hathras.etc. complete as reqd. I.T.C of 2 x 1.5 TR High Sensible Split A/c units i/c connection of copper pipes and cables etc. complete as reqd. Replacement of faulty compressor of 1.5TR capacity in the existing AC unit suitable for operation on 220 V, 50 Hz i/c weldin
Sector: Telecommunication