Description: Work of increasing capacity of TF Installation of New TF 11 KV LT Line erection and strengthening of other work in the area of EDC Etah under Business Plan 2024 25 on Semi Turnkey basis Name of Work Work of increasing capacity of TF Installation of New TF 11 KV LT Line erection and strengthening of other work in the area of EDC Etah under Business Plan 2024 25 on Semi Turnkey basis
Details: Supply of The Line Material as per Relevent ISS :- Copper L Piece 50x225x10 mm TF Holding Clamp MS T Channel with Clamp MS Top Channel Stone Pad Dropper Channel 100x50x2028 11 KV Fuse Set 11 KV F Clamp Nut and Bolts off size Suspension Clamp Dead and Clamp I Hook AB Cable 1x16+1x25 sq mm 3 Phase Distribution Box 3 Phase DO Distribution Clamp PRC Connecter LT Clamp MS Angle (TF Base Angle) with Clamp. Clamp for TF LT PVC Cable 4x16 sq mm LT PVC Cable 3.5x70/35 sq mm PVC Alluminium Cable 1x120 sq mm I Bolt for Service Cable GI Wire 10 SWG Erection Work :- Safe carriage of line material from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. Safe Carriage of 8.5 Mtr Long PCC Pole from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms. Including loading and unloading at both side Safe Carriage of 11 Mtr Long ST Pole from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit si
Sector: Distribution