Description: ADDITIONAL DISTRIBUTION TRANSFORMERS UNDER EDC ETAWAH BUSINESS PLAN 2024 25 ON SEMI TURNKEY BASIS Name of Work Installation of Additional Distribution Transformers Under Business Plan 2024 25 in the area of EDC Etawah on Semi Turnkey basis
Details: Carriage of the following material from Store Center, Etawah to 33/11 KV S/S to direct pit site in distance range 0 to 50 Km. Including loading & unloading at both ends. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. STP 55 Pole 11 Mtr Long PCC Pole 8.5 Mtr Line Materials material i.e.weasel, ab conductor and other required 16 KVA Transformer 11/0.4 kv 25 KVA Transformer 11/0.4 kv 63 KVA Transformer 11/0.4 kv 100 KVA Transformer 11/0.4 kv Supply, Fixing, Erection of following material for Installation of 11/0.4 Kv Distribiion Transformer as per RESPO Drawings/ Estimates. Work includes all cartage/carriage, T&P, and any other work which is required for completion of above said work as per satisfaction of supervisory engineer. Suspension Clamp Dead End Clamp Distribution Box 03 Phase Distribution Box Clamp PVC/Cable Connector 11 Kv Disc Insulator with fitting 11 Kv Pin Insulator fitting with Pin 11 Kv X-arm V type 11 Kv Top Chann
Sector: Distribution