Description: Temporary installation of pumps along with pump operator during the rainy season in Group I to IV at D 6 Name of work Maintenance of the work pertaining to completed closed schemes Sub Head Temporary installation of pumps along with pump operator during the rainy season in Group I to IV at D 6
Details: Temporary installation of pump set capacity 4000 L/H as per requirement and as per direction of Engineer-in-Charge for dewatering the rain water from the waterlogged area complete in all respect with pump operator, security arrangement etc. and disposal of water up to surface drain. Temporary installation of pump set capacity 4000 L/H as per requirement and as per direction of Engineer-in-Charge for dewatering the rain water from the waterlogged area complete in all respect with pump operator, security arrangement and disposal of water up to surface drain. (stand by or non working period).Special Conditions:-1. The agency will install the pumps at required location as directed by Engineer-in-Charge. The agency will make arrangement for suction as well as delivery line of appropriate length to dispose the rainwater in nearby drain as directed by Engineer-in-Charge.2. The agency will provide the pumps of capacity 4000 litres per hour as and when Engineer-in-Charge directed for the sa
Sector: Urban Authority