Description: As per bid document
Details: Overhauling of Main oil pumps of Turbine.;Inspection of bearings No. 1 or 2 or 3 or 4;Replacement of oil Guards of turbine bearing (At the time of turbine Brg. Inspection);Replacement of oil Guards of turbine bearing (Without inspection of turbine bearing.);Removal of turbine bearing cover;Overhauling of M.S/ HRH/LPBP Stop / control valves;Overhauling of Servomotors of M.S/ HRH/LPBP Stop / control valves;Replacement of M.S/HRH Strainer Gaskets;Thermal Insulation Works (IS Code No. 7413-1981) Removal of existing insulation, cladding. Repair to cladding, fixing of insulation, cladding of piping/valve boxes etc, for Unit 5 to 8;Cleaning of Thermal insulation cladding of pipings, valves etc in TG Area, 10.5Mt, 7.5Mt, 4.5Mt, "0" Mt, & PRDS-Deaerator area;Removal of existing spray insulation, repair, reinforcement, cementing of required area in HPT,IPT Stop & control valves body.;Fabrication of new cladding for bends/reducers/elbowes/valves;Wrapping of asbestos ropes/heat resistant tapes in
Sector: Generation