Details: dismantling of floor hearth or wall tiling including cement mortar bedding but not backing and removing serviceable tiles to store yard and off the primises complete all as specified and directed. taking down cement plaster or cement lime plastering , any descriptuon from brick wall including racking out joints hacking for key scrubbing down with water etc complete all as specified and directed. demolition of cement concrete (unreinforced) in ground floor and paving not exc 15cm thicknes below or above ground level complete all as specified and directed taking down steel tubing and connections and fittings 15mm bore including cleaning for refixing or removing from site complete all as specified and directed. taking down steel tubing and connections and fittings 20mm bore including cleaning for refixing or removing from site complete all as specified and directed. taking down steel tubing and connections and fittings 25mm bore including cleaning for refixing or removing from site c
Sector: Defense