Description: MODERNIZATION AND UP GRADATION OF FISHING HARBOUR AT VISHAKHAPATNAM PORT DESIGN ENGINEERING CONSTRUCTION SUPPLY INSTALLATION TESTING ERECTION and COMMISSIONING OPERATE AND MAINTAIN THE ETPS FOR A PERIOD OF ONE YEAR Name of Work MODERNIZATION AND UP GRADATION OF FISHING HARBOUR AT VISHAKHAPATNAM PORT DESIGN ENGINEERING CONSTRUCTION SUPPLY INSTALLATION TESTING ERECTION COMMISSIONING OPERATE AND MAINTAIN THE ETPS FOR A PERIOD OF ONE YEAR
Details: EFFLUENT TREATMENT PLANT :(400KLD) Supply, Fabrication, installation, testing and commisioning of Fully automatic effluent treatment plant with effluent handling capacity 400 m3 per day. The entire plant will be constructed in MSEP tanks on the basis of Percolate media treatment reactor technology and located in the Site plan of the project. The ETP shall be designed as water retaining structures, with necessary chemical dosing as required by the manufacturer's design. All the equipment, piping, pumps,pressure gauge,flow metre,level indicater,air rotametre, air blowers and electrical panel to be housed in the ETP skid including M.S. puddle flange (Galvanised), inlet, outlet, overflow, vent, moving ladders & railing, all tank paint are sea werdi paint. The Plant shall be complete with a central Electrical Power and Control panel fully pre/site wired and with all power and control cables to all pumps and equipment including all instrumentation, level and other controls. The cost wi
Sector: Harbor