Details: re tarring work 5.5.a.1a:modified macadam 50 mm thick using bitumen s-65 <br> construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn static roller to achieve the desired degree of compaction as per technical specification clause 506. 5.5.b.2a:modified macadam 75 mm thick using bitumen s-65 <br> construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn static roller to achieve the desired degree of compaction as per technical specification clause 506. <br> (b) 75 mm thick :- (ii) bitumen (s-65) 5.2.1a:tack coat<br> providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the r
Sector: RDPR