Details: drainage footpath 51.2.3:filling with quarry muck <br> filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) 4.1.8:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) 5.9.2:centering and shuttering including strutting, etc. and removal of form for:walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 5.9.3:centering and shuttering including strutting, etc. and removal of form for:suspen
Sector: RDPR