Details: road concreting 75.5.5.b.2pb:modified macadam 75 mm thick using bitumen s-65 - packed bitumen rates <br> construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn static roller to achieve the desired degree of compaction as per technical specification clause 506. 3.2:preparation of foundation for embankment <br> scarifying existing bituminous surface to a depth of 150 mm by mechanical means <br> scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 4.9:wet mix macadam <br> providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill),
Sector: RDPR