Details: road 2.2:clearing grass and removal of up to a distance of 50 metres outside the periphery of the area 3.19.2:loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction. 4.12:providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. 5.1.a:providing and applying primer coat with bitumen emulsion ( ss) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using me
Sector: Harbor