Details: supply, installation, and integration of compute nodes into the existing cluster with the following configuration:2 × intel® xeon® gold 5th generation processors with 2.8 ghz, 32 cores/64 threads, 20 gt/s, 60 mb cache, turbo, or higher;4 gb ddr5 ram per core or higher ;2 × 450 gb sata ssd with hw raid controller or higher;1 or more dual-port 1 gbps network interface card with cables;1 or more mellanox connectx-6 single-port hdr infiniband adapter with split cables of 2-3 meter length;dual, fully redundant(1+1), hot-plug power supply,1100w or higher;dedicated ipmi ethernet port with ipmi support for integrated raid configuration, and readyrails sliding rails;warranty : 4 years onsite warranty, pro support. supply, installation, and integration of gpu cards into the existing cluster with poweredge r750 nodes using the following configuration:nvidia h100 pcie gpu or higher80 gb hbm3 memory or higherwith the required connectors and kitswarranty : 4-years onsite warranty, pro support.
Sector: University