Details: earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.ss 20 a removal of excavated excess earth away from the site to 2k.m including loading and transportation charges etc, complete as per standard specification. for 1m3 plain cement concrete 1:4:8 (one cement four crushed stone sand and eight coarse aggregates) using 40mm size iss hbg metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification. supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and b.g 10stifened with welded mild steel angles of size 25m
Sector: Municipality