Details: dismantling the existing damaged floor finish & dadooing walls in cement mortar with mosaic tiles / glazed tiles / clay tiles / cuddapah slabs etc., complete. plain cement concrete 1:4:8 mix (one part cement, four part m- sand and eight part of aggrigate) using 40 mm size iss hbg metal from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing. laying and curing etc., complete as per tndss no : 28 & vi (s2) vi (s5a) vii standard specifications as directed by engineer incharge. paving the floor with pre-polished concrete anti-skid step tiles (required shape and design) of 20mm thick of approved quality and colour laid in cement mortar 1:3 (one part of cement and three part of plastering sand (p- sand)), 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 kg/sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.
Sector: RDPR