Details: earthwork excavation in all soil and sub soils except hard rock requiring blasting with initial lead and lift including re filling the sides of foundation in layer of 15 cm thick watering, ramming, depositing the surplus earth in the premises as directed by the departmental officers, etc., complete complying with standard specification. supply of gi. pvc pipe & specials including cost and conveyance of all materials and labour charges etc complete as per standard specification as per is 4985 / 2000 , 10124/1982 part-ii ,1239/part/i/2004 and 1239/part ii/90 -80 mm gi pipe 80 mm gi elbow 80 mm gi h 80 mm gi union 80 mm gm gate valve 90 mm pvc pipe 90 mm pvc bend 90 mm pvc end cap 90 mm pvc tee 90 mm pvc fta laying of pvc pipe into trench to require including cost and conveyance of all materials and labour charges to site etc., complete laying of gi pipe into trench to require including cost and conveyance of all materials and labour charges to site etc., c
Sector: RDPR