Details: earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. providing pre construction anti termite treatment for the building including all chemicals as per standard specifications. labour charges for preparing the areas for treatment spraying chemicals and other incidential charges etc., complete. the rate shall be inclusive of giving anti-termite treatment to the building for the following four stages including breaking the termite mounds making holes with crow bars at an intervel of 12"to a depth of 8" in the periphery of building and pouring chemicals etc., complete as per isi 6313-1981 and. th
Sector: Sports