Details: construction of 30,000 litres oht at elavoor village salai in elavoor panchayat earth work excavation below g.l. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil first depth of 2m from 0 to 2 m below gl second depth of 2m from 2m to 4 m below gl sand filling for foundation with clear river sand including cost of sand,watering,ramming and consolidation etc complete as directed by twad bord officers pcc 1:4:8 using 40mm hbg metal including mixing curing etc.,below 1.50 m from gl. rcc in m 30 mix using10mm& 20mm size hbg metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete below 1.5m from gl 0m to 1.50m below gl &upto 1m agl 1m to 4.50m above gl 4.50 m to 7.32 m above gl 7.32 m to 10.98 m above gl 10.98 m to 14.64 m above gl 14.64 m to 18.30 m above gl steel centering, soffits of rcc works including strutting and shuttertting charges etc. comp
Sector: RDPR