Description: Upgradation of recreational hall of Phikar Stok Name of Work UPGRADATION OF RECREATIONAL HALL OF PHIKAR STOK Adv cost 8 00 lacs Scheme GIA PYT Block CHUCHOT
Details: Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: 2.35.1 All kinds of soil Providing and laying dry stone soiling in horizontal level including the cost of stone. Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)Nallaha. Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 course sand 4 graded
Sector: RDPR